Noise: protect hearing while staying connected
5–10 minute crew discussion · Reviewed September 23, 2026
Sign on a shared device or by QR code. Or print the blank PDF to fill out later. US Letter · Print at 100% or Fit.
Leader: review the source and site procedures before presenting. Adapt this briefing to today’s task and the crew’s language and training needs. This is an original educational talk, not OSHA-issued training or certification.
Start the conversation
An electrical crew is drilling anchors beside another trade’s cutting station. Noise exposure comes from the whole work area, not only the tool in your own hands.
Key talking points
- Have the employer evaluate noise exposure and select the required controls and hearing protection. A worker’s impression that a task is not very loud does not replace assessment. Duration and the combination of nearby activities matter as well as the sound from one tool.
- Use the selected protection correctly and ask for help with fit. Keep it in good condition and follow the training provided. Do not assume music earbuds or ordinary headphones provide suitable occupational hearing protection.
- Electrical job example: a crew drills several hundred anchors in a concrete room. Discuss whether the method, equipment, work location, or coordination with other trades can reduce exposure before relying only on personal protection.
- Plan communication before noisy work begins. Agree how workers will receive stop instructions, warnings, and emergency signals while wearing protection. Removing protection repeatedly to hear a shouted message indicates that the communication arrangement needs attention.
- Consider workers passing through or working nearby. Identify how the noisy area is communicated and who coordinates simultaneous tasks. The person operating the drill may be prepared while an apprentice sorting material nearby has not been included in the briefing.
- Ask how noise-related concerns, ringing in the ears, or problems with the selected protection are reported. Encourage prompt reporting through the employer’s process. Do not wait until a worker can no longer perform a task comfortably before raising the concern.
- End by choosing one task scheduled today and describing the control and communication plan. Revisit that plan if the crew moves indoors, changes tools, or works alongside a new noise source. A routine task can have different exposure in another setting.
Ask the crew
- Which other activities add noise to our work area?
- How will we communicate a stop signal?
Before work starts
Confirm the exposure controls, hearing protection, and communication method with the supervisor before noisy work.
Toolbox talk attendance & action record
Topic: Noise: protect hearing while staying connected
Date: ____________________
Leader: ____________________
Company / jobsite: __________________________________________
Site hazards and controls discussed:
Follow-up action / responsible person / due date:
| Participant name | Signature / acknowledgment |
|---|---|
Attendance records document this discussion only; they do not certify competency or completion of required training. Complete this blank sheet after printing, or select “Start talk & collect signatures” above to create a private online attendance record.