Heat: plan water, rest, and a response
5–10 minute crew discussion · Reviewed September 23, 2026
Sign on a shared device or by QR code. Or print the blank PDF to fill out later. US Letter · Print at 100% or Fit.
Leader: review the source and site procedures before presenting. Adapt this briefing to today’s task and the crew’s language and training needs. This is an original educational talk, not OSHA-issued training or certification.
Start the conversation
Heat affects indoor and outdoor work. Heavy effort, protective clothing, and poor air movement can increase the load on the body even when the task is familiar.
Key talking points
- Follow the site heat plan, including water access, cooling areas, rest breaks, and gradual acclimatization for new or returning workers.
- Drink water regularly and watch coworkers for symptoms. Report headache, nausea, dizziness, weakness, or unusual behavior promptly.
- Confusion, slurred speech, seizures, or collapse can signal a medical emergency. Call 911, start cooling immediately, and stay with the person while help is coming.
- Move the worker to a cooler place if safe, remove excess outer clothing, and use cool water or cold packs while following emergency instructions. Do not give fluids to someone who is unconscious or cannot swallow safely.
- Electrical job example: a crew is pulling cable in a hot mechanical space while another group works outside. Discuss each location separately. A shared shift schedule does not mean both groups have the same conditions, effort, clothing, or access to cooling and drinking water.
- Before starting, identify a check-in partner and make sure everyone knows how to report feeling unwell without delaying for a break bell. Ask where a new or returning worker fits into the site’s acclimatization plan. Supervisors should know about changing conditions so the work and rest arrangements can be reassessed.
- Walk through the emergency communication: who makes the call, who guides responders to the electrical work area, and who stays with the affected person. Check that the directions describe the actual entrance and floor. Do not send a symptomatic worker away alone or assume they can safely drive themselves.
Ask the crew
- Where is our cooling area?
- Who calls emergency services and meets responders?
Before work starts
Confirm water, rest arrangements, the site address, and the emergency communication method.
Toolbox talk attendance & action record
Topic: Heat: plan water, rest, and a response
Date: ____________________
Leader: ____________________
Company / jobsite: __________________________________________
Site hazards and controls discussed:
Follow-up action / responsible person / due date:
| Participant name | Signature / acknowledgment |
|---|---|
Attendance records document this discussion only; they do not certify competency or completion of required training. Complete this blank sheet after printing, or select “Start talk & collect signatures” above to create a private online attendance record.