Powered bending: protect the pinch zone
5–10 minute crew discussion · Reviewed September 23, 2026
Sign on a shared device or by QR code. Or print the blank PDF to fill out later. US Letter · Print at 100% or Fit.
Leader: review the source and site procedures before presenting. Adapt this briefing to today’s task and the crew’s language and training needs. This is an original educational talk, not OSHA-issued training or certification.
Start the conversation
A powered bender is being used for a run of large conduit near a pedestrian route.
Key talking points
- Only trained and authorized users should operate the bender. Review its controls, capacity, accessories, and setup instructions for the actual conduit rather than assuming every machine behaves the same way.
- Mark the moving envelope of the conduit as well as the machine. A long piece can sweep into a worker who appears to be standing safely away from the bending shoe.
- Keep hands away from pinch points and use the intended supports. Stop the machine through the approved process before repositioning material or correcting a setup problem.
- Agree how the operator and helper communicate before motion begins. A helper should not reach in because a bend appears complete while the operator is still controlling the machine.
- Check floor stability, access, and power routing during setup. At shutdown, leave the machine and material secure so the next person does not encounter stored movement or an unexpected obstruction.
- Crew exercise: apply this discussion to one actual location in today's assignment. Describe the sequence from preparation through cleanup, identify who could be affected, and agree what must be in place before the first person starts. Use a drawing or a safe observation point; do not create an exposure for the demonstration.
- Make the decision practical: name the person who will resolve missing information and confirm the controls. If the planned conditions change, stop the affected activity and obtain a revised plan. At the next briefing, review whether the agreed action was completed and what the crew learned.
Ask the crew
- What is the most important hazard in our version of this task?
- What would make us stop and ask for a revised plan?
Before work starts
Identify one task-specific improvement, assign a responsible person, and confirm it is in place before the affected work begins.
Toolbox talk attendance & action record
Topic: Powered bending: protect the pinch zone
Date: ____________________
Leader: ____________________
Company / jobsite: __________________________________________
Site hazards and controls discussed:
Follow-up action / responsible person / due date:
| Participant name | Signature / acknowledgment |
|---|---|
Attendance records document this discussion only; they do not certify competency or completion of required training. Complete this blank sheet after printing, or select “Start talk & collect signatures” above to create a private online attendance record.